1.39 Release (April 2, 2026)

Portfolio Capability Updates

Yearly Cost Types

You can now create yearly cost types, in addition to Request and Allocated, to better track project spending over time.

  • Set up cost types in the Cost Types tab in Settings:

  • Create up to 8 yearly cost types

  •  Add descriptions to clarify what each cost represents

  • Arrange them in your preferred order

  • Remove any that are no longer needed

  • Control access by assigning permissions to Participants and Contributors, so the right people can view or manage cost data for your new cost types.

  • Add cost data by importing it or entering it manually on the Budgets page or within a project’s Cost Table

  • Customize calculations by updating the “Allocated – Request” column on the Budgets page to include your yearly cost types, so it reflects the differences your organization wants to track.

Connected Portfolios (Beta)

Create connections between portfolios to seamlessly share and keep project data in sync across multiple portfolios.

  • Configure connections from the Connected Portfolios tab in Portfolio Settings. When creating connections, define the Unique ID to link portfolios and the direction in which data can flow.

  • Send data to other portfolios using the Actions menu

  • Select destination portfolios, along with the projects and fields to include

  • Projects and fields not found in the destination can be added as new or excluded from the send.

  • Preview changes before sending
    • View counts of projects and fields that will be added or updated

    • Identify locked projects that will not be updated

    • Know when new statuses will be created in the destination portfolio

Prioritization Module Updates
  • Include prioriKzaKons when duplicaKng a portfolio

  • Duplicate surveys for Ratings or Priorities collecitons

  • View your priorities as a new Pie Visualization from the Value Score page

  • Survey Weights: Set how much each rater contributes to the overall rating results. 
  • Within Value Score results, view which columns have filters applied

Bugs Fixed

  • Homepage survey tasks are removed when a prioriKzaKon is deleted

  • Project end dates remain consistent aXer pod file export and import

  • Voting on behalf of others now maintains the selected view

  • Spend Plan opKon is now hidden when not enabled

  • Combined porLolios no longer display incorrect prioriKzaKon navigaKon

  • Fields now mapped correctly during import instead of appearing as values

  • Value charts now display correctly on My Plans

  • Value score table now appears aXer refreshing data

  • Value score visualization headers no longer truncate text unnecessarily

  • Scoresheet exports now include min and max values for formula fields

  • Cost category project column exports now show names instead of IDs

  • Scale options column now resizes appropriately with a large number of raters

  • Weight sets can now be edited in Score Sheet and Detailed Results views